Marine gas installation uk
Every vessel must now have a carbon monoxide alarm fitted, which complies with BS EN - does yours? Our fully automated software system, manages all aspects of you and your boat's gas requirements. Certificates and invoices are completed and sent electronically and our database ensures that we know exactly what work we have carried out on board, no matter how many years we have been looking after you.
Ex eter Bristol portishead Cardiff thames London Newport taunton Yeovil lyme Gloucester Cheltenham oxford reading devizes Bradford on avon trowbridge bath dover Folkestone hastings Eastbourne brighton Worthing Portsmouth emsworth Chichester birdham Gosport hayling island southsea solent isle of wight cowes ryde Fareham portchester Yarmouth warsash hamble swanwick ocean Southampton hythe marchwood beaulieu lymington Christchurch poole wareham Weymouth Portland kennet avon Windsor berks canal cerney lechlade little venice twickenham gassafetymarine.
It is in our interest for all our boat heating engineers to complete work in a timely manner, without compromising on quality. All our time is payable by the half-hour , making small repairs and annual servicing much more affordable. We are happy to offer custom arrangements and bulk discounts, for marinas, boatyards, caravan parks, etc.
Please note that there is a one-hour minimum charge for every call out. If you are further away we would decide a call-out rate on an individual basis, depending on the size of the job. We can offer group bookings. Book together with your neighbours and nearby boats and we will charge a combined call-out rate, splitting the cost between you. Please note that London rates may be different.
Estimates and assessments for boat heating and plumbing are free. Call out travel time is payable as outlined above. Alternatively, you can bring your boat to us on the river Thames. For gas work, we are legally obligated to carry out safety checks of the entire installation, when working on any part of it. These are normally done in the form of an LPG Safety Certificate and charged at the normal hourly rate.
We recommend doing this during the initial assessment. We can then see what is needed to bring the installation up to standard and add this to the estimate. Most materials can be supplied by us. The cost for this will be added to your invoice and is additional to labour rates. All call-outs are payable on the day directly to our engineer. Services that take longer than 1 day, like fitting new heating systems, will require payment at the end of each day.
We accept cash or card payments only. Hourly rates charged for diesel stove engineer and solid fuel stove engineer call-outs. Every half hour started is payable in full. Call out fee applies, as listed above We offer diesel heater, diesel stove and solid fuel stove installation, repairs and services. This is the standard rate Monday to Friday 9 am to 5 pm.
See our premium rate for all other times. Please see our website for details. This rate also applies to fresh and grey water plumbing works.
Hourly rates charged for boat gas engineer and LPG engineer call-outs. To be replaced. Should be replaced every 5 years. In French "Replace Before " 8 Year old gas hose. Gas Drain - LPG is heavier than air and it is a searching gas. Any leakage will seek out the lowest point of any enclosed area. The main principle is to have the bottles and regulators in a gas locker which is designed with a drain at the lowest point so that the gas drains overboard and not into the interior of the vessel.
Avoidance of Leakage - The system should be without leaks, maintained in a good condition by following good practices and replacing deteriorated components. The system should be installed to approved standards and any alterations to the system must also be done to approved standards and not introduce problems. Secured Against Damage - The bottles, regulators, piping must be located and secured so they cannot be damaged by items falling on or against them.
All cylinders must be stored upright and secured from movement, in a locker which is gas tight to the hull interior at least to the height of the regulators. The locker must be with a drain at the lowest point that leads overboard above the waterline. The drain should have a diameter of 19mm. The locker must not contain items that could damage the bottle or block the drain. The locker should have a fire resistance of 30mins. This is to provide a good chance to fight a fire on board without the bottles exploding too.
Therefore it should be constructed of metal at least 0. Flexible Hoses should be kept to a minimum length, no longer than 1m. High pressure hoses should be of pre-assembled type with the fittings already on them. Flexible Hoses must be connected to terminals with proper hose barbs and be secured with a stainless clip. Direct connection to copper piping with no hose fitting is not permitted.
Installation pipework should be without joins if it passes through the engine compartment. Installation pipework should be solid drawn copper joined with compression fittings rather than soldering or brazing. The number of joins should be minimised. The pipework should be properly supported along its length at positions no more than mm apart and be located as high as practicable.
0コメント